TM-9-2320-272-23-3

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 3 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-3 - Page 148 of 1469

FOLLOW-ON MAINTENANCE
1.
Install main light switch. (Volume 2, WP
0315)
2.
Install failsafe warning module. (Volume 2, WP
0336)
3.
Install turn signal flasher. (Volume 2, WP
0318)
4.
Install protective control box. (Volume 2, WP
0319)
5.
Install battery ground cables. (Volume 2, WP
0350)
6.
Install splash shields. (TM 9-2320-272-10)
7.
Install air intake pipe. (TM 9-2320-272-10)
END OF TASK
END OF WORK PACKAGE
TM 9-2320-272-23-3
0357
0357-47/48 blank


Back to Top