INSTALLATION - Continued
20.
Connect wires (Figure 15, Items 1 and 4) to wires (Figure 15, Items 2 and 3).
21.
Connect rear wiring harness connector (Figure 15, Item 6) to front wiring harness receptacle
(Figure 15, Item 5).
NOTE
Perform step 22 for M929/A1/A2, M930/A1/A2, M931/A1/A2, M932/A1/A2, and M936/A1/A2
vehicles only.
22.
Connect wires (Figure 15, Items 7 and 8).
23.
Connect wire (Figure 15, Item 9) to transmission temperature sending unit (Figure 15, Item 12).
24.
Close spring tension tab (Figure 15, Item 10) around wires (Figure 15, Items 9 and 11).
TM 9-2320-272-23-3
0359
0359-26