INSTALLATION
1.
Install grommet (Figure 2, Item 12) on junction box (Figure 2, Item 13).
NOTE
Assistant will help with Step (2).
2.
Install telephone jack post (Figure 2, Item 14) on grommet (Figure 2, Item 12) and junction box
(Figure
2,
Item
13).
3.
Install lead (Figure 2, Item 10) on telephone jack post (Figure 2, Item 14) with nut (Figure 2, Item 11) and screw
(Figure
2,
Item
9).
4.
Pry inside panel (Figure 2, Item 19) over studs (Figure 2, Item 6) and onto frame (Figure 2, Item 1).
5.
Install panel retainer (Figure 2, Item 7) on inside panel (Figure 2, Item 19) with 23 screws
(Figure
2,
Item
8).
6.
Install two thermostats (Figure 2, Item 2) on inside panel (Figure 2, Item 19) with eight screws
(Figure
2,
Item
3).
7.
Install thermostat cover (Figure 2, Item 4) on two thermostats (Figure 2, Item 2) and inside panel
(Figure
2,
Item
19) with two screws (Figure 2, Item 5).
8.
Install gasket (Figure 2, Item 15) and cover (Figure 2, Item 17) on van body (Figure 2, Item 18) with four screws
(Figure 2, Item 16).
TM 9-2320-272-23-4
0627
0627-4