TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 497 of 1393

REMOVAL - Continued
19.
Remove screw (Figure 5, Item 8) and wire (Figure 5, Item 7) from neutral buss bar (Figure 5, Item 3).
20.
Remove three screws (Figure 5, Item 5) and wires (Figure 5, Item 6) from three circuit breakers
(Figure
5,
Item
4).
21.
Remove right 10 kW electric heater wiring harness (Figure 5, Item 1) from load center (Figure 5, Item 2).
M10288DAA
5
6
7
8
4
3
2
1
Figure 5.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-6


Back to Top