TM-9-2320-272-23-4

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; FIELD MAINTENANCE MANUAL; VOLUME 4 OF 5

SEPTEMBER 2012

  TM-9-2320-272-23-4 - Page 494 of 1393

REMOVAL - Continued
7.
Remove three screws (Figure 2, Item 16) and wires (Figure 2, Item 1) from relay (Figure 2, Item 2).
8.
Remove screw (Figure 2, Item 14) and wire (Figure 2, Item 15) from neutral buss bar (Figure 2, Item 4).
9.
Remove screw (Figure 2, Item 10) and wires (Figure 2, Item 13) from circuit breaker (Figure 2, Item 5).
10.
Remove screw (Figure 2, Item 9) and wires (Figure 2, Item 12) from circuit breaker (Figure 2, Item 6).
11.
Remove screw (Figure 2, Item 8) and wire (Figure 2, Item 11) from circuit breaker (Figure 2, Item 7).
12.
Remove left main wiring harness (Figure 2, Item 17) from load center (Figure 2, Item 3).
M3059DAA
6
5
7
4
3
2
1
17
16
15
14
13
12
11
10
9
8
Figure 2.
Load Center Box.
TM 9-2320-272-23-4
0639
0639-3


Back to Top