TM-9-2320-272-24-2

TRUCK, 5-TON, 6X6, M939, M939A1, AND M939A2 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL; VOLUME 2 OF 4

JUNE 1998

  TM-9-2320-272-24-2 - Page 337 of 991

TM 9-2320-272-24-2
3-384. HOIST WINCH CABLE REPLACEMENT (Contd)
5.
6.
Wind cable (4) on hoist winch drum (6) until clevis (3) end of cable (4) leaves ground.
Thread cable clevis (3) through snatch block (14), over forward boom sheave (11), and back to snatch
block (14).
7.
Remove nut (13) and anchor bolt (12) from snatch block (14) and install cable clevis (3) with anchor
bolt (12) and nut (13).
8.
9.
Install two spacers (15) on forward boom (18) with two screws (17) and new locknuts (16).
Install rear cable guard (20) over rear sheaves (19) on boom (1) with four washers (21), new
lockwashers (22), and screws (23).
10.
Raise snatch block (14) and place in stowage position (TM 9-2320-272-10).
11.
Place hoist control in NEUTRAL position and stop vehicle (TM 9-2320-272-10).
NOTE
Direct assistant to maintain tension on hoist cable and observe
that cable is winding properly.


Back to Top