4-192. HOIST
TM 9-2320-272-24-3
FOLLOW-ON TASKS: • Install hoist level wind (para. 4-191).
• Install hydraulic hoist winch motor and lines (para. 4-190).
• Install hoist winch cable (para. 3-384).
• Install boom floodlight wire (para. 3-385).
• Fill hoist winch to proper oil level (LO 9-2320-272-12).
4-909