TM-9-2320-280-20-3

TRUCK, UTILITY: M998 SERIES

TECHNICAL MANUAL; UNIT MAINTENANCE; VOLUME 3 OF 3

JANUARY 1996

  TM-9-2320-280-20-3 - Page 602 of 1168

12-10. CDR VALVE VENT LINE REPLACEMENT
This task covers:
a. Removal
b. Installation
a. Removal
1.
Loosen clamp (2) and disconnect CDR valve vent line (3) from CDR valve (1).
2.
Remove two tiedown straps (5) from vent line (3) and existing hoses (6) on “A” beam (4).
Discard tiedown straps (5).
3.
Loosen clamp (2) and remove vent line (3) from elbow (8) on selector valve (7).
4.
Remove clamps (2) from vent line (3).
INITIAL SETUP:
Applicable Models
All models except M966, M966A1, M1025,
M1025A1, M1025A2, M1026, M1026A1,
M1097, M1097A1, M1097A2
Tools
General mechanic’s tool kit:
automotive (Appendix B, Item 1)
Materials/Parts
Two tiedown straps (Appendix G, Item 314)
Manual References
TM 9-2320-280-10
TM 9-2320-280-24P
Equipment Condition
Hood raised and secured (TM 9-2320-280-10).
b. Installation
1.
Install clamps (2) on vent line (3).
2.
Connect vent line (3) to elbow (8) on selector valve (7) with clamp (2).
3.
Install vent line (3) along “A” beam (4) on existing hoses (6) with two tiedown straps (5).
4.
Connect vent line (3) to CDR valve (1) with clamp (2).
TM 9-2320-280-20-3
Change 2
12-13
FOLLOW-ON TASK: Lower and secure hood (TM 9-2320-280-10).
1
2
3
4
5
6
7
3
2
8
~


Back to Top