TM 9-2320-328-13&P-1
0029-2
DRAFT
0029
Change 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
CAUTION
Do not open any foam agent supply tanks while performing flush procedures or
damage to equipment may occur.
2.
Ensure foam manual METERING VALVE (1) is in OFF position.
3.
Using pressure governor, adjust water pump discharge pressure to 125 psi (862 kPa) (WP 0017).
4.
Put FOAM FLUSH switch (2) to ON position.
Indicator light (3) will illuminate.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Be sure to wear proper eye protection to prevent injury or death.
Open and close all
valves slowly during any procedure.
Sudden changes in pressure may cause
equipment to react faster than personnel can be alerted.
Make sure surrounding
personnel are aware of changes being made to settings on equipment.
Failure to
comply may result in injury or death to personnel and damage to equipment.
CAUTION
Do not allow foam system pressure to exceed 250 psi (1,724 kPa).
Failure to comply
may result in damage to equipment.
5.
Put foam manual METERING VALVE (1) in fully OPEN position.
NOTE
Perform Steps (6) through (8) for discharges that were used.
6.
Open discharge valves and flush out all discharges that were used, removing foam until water runs clear.
7.
While flushing, open and close foam manual METERING VALVE (1) at least twice or until water runs clear
from discharge.
HWT0292
WARNING
ICON 66 AND 26