TM 9-2320-328-13&P-1
0069-16
DRAFT
0069
Change 1
..
HWT0569
..
Step 19.
Install circuit breaker P6 (WP 0262).
Open pump operator’s panel (WP 0207).
Disconnect pump house wire harness NO. 2 PASSENGER SIDE DISCHARGE valve
control connector.
Push battery disconnect switch to on position (WP 0007).
Check for
22 to 28 VDC between pump operator’s panel wire harness wire 4077 (blue) at NO. 2
PASSENGER SIDE DISCHARGE valve control connector, terminal A and a known
good ground.
..
If 22 to 28 VDC are not present, go to Step 21.
..
Step 20.
Pull battery disconnect switch to off position (WP 0007).
With a test lead set, check for
continuity across wire 3895 (black) from pump operator’s panel NO. 2 PASSENGER
SIDE DISCHARGE valve control connector, terminal B and a known good ground.
..
a.
If there is continuity, replace No. 2 PASSENGER SIDE DISCHARGE
valve control (WP 0210).
..
b.
If there is no continuity, repair wire 3895 in pump operator’s panel wire
harness if repairable (TM 9-2320-325-14&P), or replace pump
operator’s panel wire harness (WP 0303).
..
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION