TM 9-2320-328-13&P-1
0072-94
DRAFT
0072
Change 1
..
HWT2654
..
Step 115.
With a test lead set, check for continuity across CAT Lo wire (green) from main wire
harness cab pressure governor control connector, terminal 9 to pump operator’s panel
pressure governor control connector, terminal 9.
..
If there is continuity, go to Step 120.
..
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION