TM-9-2320-328-13-P-1

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 1 OF 3

MARCH 2009

  TM-9-2320-328-13-P-1 - Page 952 of 1318

TM 9-2320-328-13&P-1
0085-12
DRAFT
0085
HWT1386A
Step 16.
Push battery disconnect switch to on position (WP 0007).
Put WINDSHIELD DELUGE
switch to on position (WP 0004).
Check for 22 to 28 VDC between pump house power
distribution wire harness wire 2769 (red) from relay P5 connector, terminal 1 to a known
good ground.
If 22 to 28 VDC are present, replace relay P5 (WP 0263).
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION


Back to Top