TM 9-2320-328-13&P-2
0151-8
DRAFT
0151
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
11. Lightly lubricate preformed packing (8) with clean oil, and install preformed packing (8) and hose 1682906 (7)
on fitting (9).
12. Lightly lubricate preformed packing (5) with clean oil, and install preformed packing (5) and hose 1682840 (4)
on elbow (6).
13. Lightly lubricate preformed packing (2) with clean oil, and install preformed packing (2) and hose 1682839 (1)
on elbow (3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install hydraulic heat exchanger shroud panel A (WP 0137)
2.
Fill hydraulic reservoir (WP 0145)
END OF TASK
END OF WORK PACKAGE
HWT1839