TM 9-2320-328-13&P-2
0150-2
DRAFT
0150
INSTALLATION
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1.
Lightly lubricate preformed packing (4) with clean oil, and install preformed packing (4) and
hydraulic
reservoir temperature sensor (3) on hydraulic reservoir (5).
2.
Connect hydraulic reservoir temperature sensor connector (1) on pump house wire harness connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Fill hydraulic reservoir (WP 0145)
2.
Check for leaks (TM 9-2320-422-10)
3.
Close pump house panel K access door (WP 0008)
END OF TASK
END OF WORK PACKAGE
HWT0466