TM 9-2320-328-13&P-2
0191-3/(4 blank)
DRAFT
0191
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2.
Connect water tank fill & re-circulating line valve connector (1) on valve control wire harness connector (2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install under truck nozzles valve (WP 0323)
2.
Install foam system flush valve (WP 0179)
3.
Install pump house panel G (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT0103