TM 9-2320-328-13&P-2
0274-3
DRAFT
0274
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3.
Install cab instrument panel A (2) on cab instrument panel assembly (3) with six screws (1).
END OF TASK
TERMINAL BLOCK ON FRAME RAIL BY BATTERY DISCONNECT SWITCH REMOVAL
NOTE
•
Tag and mark wires prior to removal to ensure proper installation.
•
Remove cable ties as required.
1.
Remove nut (1), washer (2), and wires (3) from screw (4).
2.
Remove two locknuts (5), washers (6), screws (7), and terminal block (8) from wire harness bracket (9).
Discard locknuts.
END OF TASK
HWT2822
HWT2592