TM 9-2320-328-13&P-3
0339-26
DRAFT
0339
Change 1
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
4.
Install two pipes (15) and (14) on vehicle (WP 0318).
5.
Install rubber guard (12) on pump house panel N (13) with seven clips (11), washers (10), lockwashers (9),
and screws (8).
6.
Install hump hose (5) on pipe (7) and pipe (6) and tighten two clamps (4) and (3).
7.
Install two couplings (2) and (1) on vehicle (WP 0313).
8.
Install hose reel on vehicle (WP 0247).
END OF TASK
HWT1017A
HWT1016