TM 9-2320-328-13&P-3
0340-1
DRAFT
0340
FIELD LEVEL MAINTENANCE
PUMP HOUSE ASSEMBLY REPLACEMENT
INITIAL SETUP:
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Tools and Special Tools
Cap Set, Protective (WP 0398, Item 1)
Drain Pan (WP 0398, Item 4)
Tool Kit, General Mechanic’s: Automotive
(WP 0398, Item 17)
Materials/Parts
Tags, Identification (WP 0400, Item 23)
Ties, Cable, Plastic (WP 0400, Item 26)
Compound, Sealing (WP 0400, Item 10)
Preformed Packing (1)
Preformed Packing (1)
Preformed Packing (1)
Lockwasher (2)
Lockwasher (1)
Locknut (2)
Locknut (1)
Locknut (4)
Locknut (4)
Locknut (4)
Locknut (3)
Personnel Required
MOS 63B Wheeled Vehicle Mechanic (4)
References
WP 0313
WP 0391, Fig. 70, 71, 72
Equipment Conditions
Water system drained (WP 0015)
Foam system drained (WP 0022)
Hydraulic reservoir drained (WP 0145)
Power take off (PTO) drive shaft removed
(WP 0154)
Pump house panels A, B, E, G, H, K, and L
removed (WP 0339)
Battery box removed (WP 0238)
Pump operator’s panel opened (WP 0207)