TM-9-2320-328-13-P-3

HEMTT-BASED WATER TENDER (HEWATT)

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST); PART 3 OF 3

MARCH 2009

  TM-9-2320-328-13-P-3 - Page 389 of 844

TM 9-2320-328-13&P-3
0384-9/(10 blank)
DRAFT
0384
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
14. Position bulkhead fitting (5) on pump house bracket (6) with lockwasher (4) and nut (3).
15. Install line (1) on fitting (2).
END OF TASK
FOLLOW-ON MAINTENANCE
Install Pump house panels H and P (WP 0339)
END OF TASK
END OF WORK PACKAGE
HWT1846


Back to Top