TM 9-2320-328-13&P-3
0338-5
DRAFT
0338
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
13. Remove two nuts (38), lockwashers (39), washers (40), and guide (41) from upper door (8).
Discard
lockwashers.
14. Remove rod (42) and two plastic inserts (43) from guide (41).
END OF TASK
INSTALLATION
1.
Install two plastic inserts (43) and rod (42) on guide (41).
2.
Install guide (41) on upper door (8) with two washers (40), lockwashers (39), and nuts (38).
3.
Install two rubber hooks (37) on brackets (34) with two screws (36) and locknuts (35).
4.
Install two brackets (34) on upper door (8) with two screws (33), four washers (32), two lockwashers (31), and
nuts (30).
5.
Install two latches (29) on pump house panel A (18) with four screws (28) and locknuts (27).
HWT2406