TM 9-2320-361-20
Section Il. POWER TAKEOFF CONTROLS AND LINKAGE MAINTENANCE
13-19. POWER TAKEOFF CONTROLS AND LINKAGE MAINTENANCE INDEX
PARA.
NO.
TITLE
PAGE
NO.
13-20.
Transmission Power Takeoff (PTO) Shift Linkage
13-34
Maintenance
13-21.
Power Divider Propeller Shaft Replacement (M764)
13-36
13-22.
Hydraulic Hoist Control Linkage Maintenance
13-38
(M342A2)
13-23.
Power Divider Control Lever and Linkage Replacement
13-40
(M764)
13-20. TRANSMISSION POWER TAKEOFF (PTO) SHIFT LINKAGE MAINTENANCE
This task covers:
a. Removal
c. Adjustment
b. Inspection
d. Installation
INITIAL SETUP:
APPLICABLE MODELS
REFERENCES (TM)
All
TM 9-2320-361-10
MATERIALS/PARTS
TM 9-2320-361-20P
Three locknuts
EQUIPMENT CONDITION
Cotter pin
Parking brake set (TM 9-2320-361-10).
Screw-assembled lockwasher
1. Remove screw-assembled lockwasher (4) from vehicle floor (6) and open master cylinder access
door (5). Discard screw-assembled lockwasher (4).
2. Remove two locknuts (3), screws (2), and hinge lock (1) from cab floor (6). Discard locknuts (3).
3. Remove cotter pin (10) and clevis pin (18) from shift rod (12) and transmission PTO lever (19) and
clevis (11). Discard cotter pin (10).
4. Remove locknut (9), screw (8), and transmission PTO lever (19) from support (21). Discard
locknut (9).
5. Remove two screws (7) and support (21) from master cylinder (20).
6. Pull clevis pin (17) out far enough to allow shifting rod (12) to be removed from PTO arm (14).
7. Remove clevis pin (17), ball (15), and spring (16) from clevis (13). Remove shift rod (12).
Inspect all parts for bends, breaks, or cracks, and ball (15) for roundness. Replace damaged parts.
Install spring (16), ball (15), and clevis pin (17) to clevis (13) and PTO arm (14) and adjust shift rod (12)
to measure 5.63 in. (14.3 cm) from centers of clevis (13) and clevis (11).
13-34