TM-9-2320-361-34

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

MAY 1992

  TM-9-2320-361-34 - Page 209 of 764

TM 9-2320-361-34
8-4. TRANSMISSION TOP COVER REPLACEMENT
THIS TASK COVERS:
a. Removal
b. Installation
INITIAL SETUP
APPLICABLE MODELS
REFERENCES (TM)
All
TM 9-2320-361-20
TOOLS
TM 9-2320-361-34P
General mechanic’s tool kit
EQUIPMENT CONDITION
(Appendix B, Item 1)
Transmission gearshift lever removed
Torque wrench, 1/2-in. dr. (Appendix B, Item 7)
(TM 9-2320-361-20).
MATERIALS/PARTS
.
Cab tunnel cover removed (TM 9-2320-361-20).
Gasket (Appendix F, Item 81)
Eight screw-assembled lockwashers
(Appendix F, Item 157)
a. Removal
CAUTION
Prevent dirt from entering transmission when performing this task.
Failure to do so may damage equipment.
Remove eight screw-assembled lockwashers (1), transmission top cover (6), and gasket (4) from
transmission (3). Discard screw-assembled lockwashers (1) and gasket (4).
I
b. Installation
1. Aline shifter forks (5) with synchronizers (2).
2. Install new gasket (4) and transmission top cover (6) on transmission (3) with eight new screw-
assembled lockwashers (1). Tighten screw-assembled lockwashers (1) 25-32 lb-ft (34-43 N-m).
/
FOLLOW-ON TASKS: . Install cab tunnel cover (TM 9-2320-361-20).
Install transmission gearshift lever (TM 9-2320-361-20).
8-8


Back to Top