TM-9-2320-361-34

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

MAY 1992

  TM-9-2320-361-34 - Page 541 of 764

TM 9-2320-361-34
15-53. PIPELINE CONSTRUCTION TAILBOARD ROLLER MAlNTENANCE(Contd)
d. Assembly
NOTE
Lubricate bearings and seats before installation.
Install two bearings
(11) and seats (6) on roller (7) with eight screws (5) and two new seals (4).
I
e. Installation
1.
2.
3.
4.
5.
6.
WARNING
All personnel must stand clear during lifting operations. A swinging
or shifting load may cause injury to personnel.
NOTE
Assistant will help with lifting operations.
Attach lifting device and chain to roller (7).
Position roller (7) between two housings (9) on subframe (8).
Install roller (7) and recorded number of shims (10) on housings (9) with two pins (1), eight new
lockwashers (3), and screws (2).
Use dial indicator to measure end play between roller (7) and housing (9).
Install or remove shims, as needed (step 3), to provide 0.03 in. (0.76 mm) minimum end play.
Remove lifting device and chain from roller (7).
15-230


Back to Top