TM-9-2320-361-34

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

MAY 1992

  TM-9-2320-361-34 - Page 537 of 764

TM 9-2320-361-34
15-52. PIPELINE CONSTRUCTION TOOLBOX REPLACEMENT
(Contd)
b. Installation
WARNING
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
All personnel must stand clear during lifting operations. A
swinging or shifting load may cause injury to personnel.
Toolbox is heavy. Support toolbox during installation. Failure to do
so may result in injury to personnel.
CAUTION
Do not lift subframe 0.5 in. (1.27 cm) above frame. Damage to
equipment may result.
NOTE
Assistant will help with lifting operations.
Attach chains to subframe (3) and lifting device.
Raise subframe (3) from frame (11) 0.5 in. (1.27 cm) maximum.
CAUTION
Use care when installing toolbox on frame and sills. Damage to
equipment may result.
Position toolbox (15) on frame (11) and lower subframe (3) onto frame (11).
Install toolbox (15) on subframe (3) with six screws (1) and new locknuts (14).
Remove two locknuts (6) from two screws (5). Discard locknuts (6).
Ensure subframe (3) is correctly positioned on frame (11).
Install four screws (2), washers (9), and new locknuts (12) on two brackets (13). Tighten lock-
nuts (12) 65-85 lb-ft (88-115 N.m).
Install four screws (2), washers (9), and new locknuts (10) on four brackets (8). Tighten lock-
nuts (10) 125-165 lb-ft (170-224 N.m).
Install four screws (2) and new locknuts (7) on two plates (4).
Install two new locknuts (6) on two screws (5).
Remove chains and lifting device from subframe (3).
15-226


Back to Top