TM-9-2320-361-34

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

MAY 1992

  TM-9-2320-361-34 - Page 528 of 764

TM 9-2320-361-34
I
15-51.
PIPELINE CONSTRUCTION BODY MAINTENANCE
THIS TASK COVERS:
a. Subframe Removal
d. Flooring Installation
b. Flooring Removal
e. Subframe Installation
c. Inspection
INITIAL SETUP
APPLICABLE MODELS
EQUIPMENT CONDITION
M756A2
TOOLS
General mechanic’s tool kit
(Appendix B, Item 1)
Torque wrench, 1/2-in. dr.
(Appendix B, Item 7)
1-1/8-in. socket, 1/2-in. dr.
(Appendix B, Item 10)
1-1/16-in. socket, 1/2-in. dr.
(Appendix B, Item 11)
MATERIALS/PARTS
Fifty-six locknuts (Appendix F, Item 110)
Six locknuts (Appendix F, Item 89)
Eight locknuts (Appendix F, Item 104)
Six locknuts (Appendix F, Item 103)
PERSONNEL REQUIRED
Two
REFERENCES (TM)
TB 43-0209
Bows and tarp removed (TM 9-2320-361-10).
Side panels removed (TM 9-2320-361-20).
Tailgate removed (TM 9-2320-361-20).
Stiff
leg jack removed (TM 9-2320-361-20).
Gin pole removed (TM 9-2320-361-20).
Front and rear splash guards removed
(TM 9-2320-361-20).
Step plate removed (TM 9-2320-361-20).
Tailboard roller removed (para. 15-53).
GENERAL SAFETY INSTRUCTIONS
All personnel must stand clear during lifting
operations.
Toolbox is heavy. Ensure toolbox is empty and
supported before removal and installation.
. Toolbox and subframe are heavy. Ensure lifting
capacity is greater than weight of the toolbox and
subframe.
TM 9-2320-361-10
TM 9-2320-361-20
TM 9-2320-361-34P
15-217


Back to Top