TM-9-2320-361-34

2-1/2-TON, 6x6, M44A2 SERIES TRUCKS (MULTIFUEL)

TECHNICAL MANUAL; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE

MAY 1992

  TM-9-2320-361-34 - Page 76 of 764

TM 9-2320-361-34
I
3-7. ROCKER ARMS AND PUSHRODS MAINTENANCE
(Contd)
I
e.
Installation
CAUTION
All rocker arm adjusting screws must be backed off flush with
rocker arm body before installation on cylinder head. Failure to do
so may bend pushrods and damage rocker arms.
1. Position six pushrods (6) in channels (5) through cylinder head (4) and seat in six tappets (3).
2. Position six rocker arms (7) on pushrods (6) and three supports (2) on cylinder head (4).
3. Install three supports (2) on cylinder head (4) with six new lockwashers (8) and screws (1).
4. Tighten six screws (1)28 lb-ft (38 N•m).
3-25


Back to Top