TM 9-2320-366-20-4
10-12
Change 2
10-3.
DIFFERENTIAL SPIDER ASSEMBLY REPLACEMENT
This task covers:
a.
Removal
b.
Cleaning/Inspection
c.
Installation
d.
Follow-On Maintenance
INITIAL SETUP
Equipment Conditions
Engine shut down (TM 9-2320-366-10-1).
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-175 lb-ft (Item 58, Appendix C)
Goggles, Industrial (Item 15, Appendix C)
Gloves, Rubber (Item 13, Appendix C)
Pan, Drain (Item 24, Appendix C)
Materials/Parts
Rag, Wiping (Item 50, Appendix D)
Gasket Maker, RTV Silicone (Item 21.1,
Appendix D)
Solvent, Dry Cleaning (Item 65, Appendix D)
Grease, Automotive and Artillery (GAA) (Item 22,
Appendix D)
Packing, Preformed (4) (Item 208, Appendix G)
a. Removal.
(1)
Position fill port at 6 o'clock location.
(2)
Drain oil from wheel end hub assembly (3).
(2.1)Remove 12 screws (2) from bevel gear hub
cover (3).
(2.2)Remove bevel gear hub cover (3) from wheel end
hub assembly (1).
(3)
Remove thrust bearing (4) and thrust washer (5)
from bevel gear hub cover (2).
NOTE
Front, intermediate, and rear axle different-
ial spider assemblies are removed the same
way. Left front axle differential spider
assembly shown.