TM-9-2320-366-34-2

M1083 SERIES, 5 TON, 6x6, MEDIUM TACTICAL VEHICLES (MTV)

TECHNICAL MANUAL; MAINTENANCE INSTRUCTIONS; DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE; VOLUME NO. 2 OF 4

AUGUST 2005
CHANGE 2

  TM-9-2320-366-34-2 - Page 1042 of 1434

TM 9-2320-366-34-2
13-41. M1088 RAMP REPLACEMENT (CONT)
b. Installation.
CAUTION
Ensure ramp is in full contact with frame rail
prior to installation. Failure to comply may
result in damage to equipment.
NOTE
• Steps (1) through (3) require the aid of an
assistant.
• Left and right side ramps are installed the same
way. Left side shown.
(1) Position ramp (1) and rear shock absorber bracket (2) on
frame rail (3) with two bolts (4) and self-locking nuts (5).
(2) Position front shock absorber bracket (6) on ramp (1)
with two bolts (7) and self-locking nuts (8).
(3) Tighten two self-locking nuts (5 and 8) to 210-225 lb-ft
(285-305 N·m).
c. Follow-On Maintenance.
Install rear shock absorbers (TM 9-2320-366-20-4).
End of Task.
13-382


Back to Top