TM-9-2320-386-24-1-1

2-1/2-TON, 6X6, M44A3 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; EXTENDED SERVICE PROGRAM (ESP); UNIT, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL; VOLUME 1 OF 2

MAY 2001

  TM-9-2320-386-24-1-1 - Page 118 of 1078

0016 00-19/20 blank
Table 2. STE/ICE-R GO-Chain Tests (Contd)
NOTE
• Test G01, VTM Connections and Checkout, must be performed before
running any other STE/ICE-R test.
• At publication date, constants have not been determined. Inaccurate
readings may result. Notify your supervisor.
COMPRESSION UNBALANCE TEST
G08
DCA
MODE
CAUTION
Do not perform more than two Compression Unbalance
Tests in a row, or vehicle batteries may be discharged.
Engine must be at normal operating temperature
before performing Compression Unbalance Test.
NOTE
The Compression Unbalance Test takes approximately
15 seconds to run.
TEST NO.
TEST
14
COMPRESSION
UNBALANCE
(POWER CABLE)
RUN COMPRESSION UNBALANCE TEST:
NOTE
Compression Balance Test 14 cannot be ran at this
time as constants need to be developed after vehicle is
fielded.
• The Compression Unbalance Test limit is 0-10%.
• Is the compression unbalance within limits?
• Rerun Compression Unbalance Test.
• If unbalance is still out of limits,
notify DS maintenance.
• End of GO-Chain testing.
NO
YES
END OF WORK PACKAGE
TM 9-2320-386-24-1-1
0016 00


Back to Top