NOTE
This procedure is the same for the engine coolant heater control
box.
REMOVAL
1.
Disconnect wiring harness (4) from control box (7).
2.
Disconnect wire 400 (6) from wire 400 (5).
3.
Remove two nuts (2), lockwashers (1), and control box (7) from bracket (3). Discard lockwashers (1).
INSTALLATION
1.
Install control box (7) on bracket (3) with two new lockwashers (1) and nuts (2).
2.
Connect wire 400 (6) to wire 400 (5).
3.
Connect wiring harness (4) to control box (7).
4.
Connect battery ground (GND) cable (WP 0121 00).
0248 00-2
TM 9-2320-386-24-1-1
0248 00
PERSONNEL HEATER CONTROL BOX REPLACEMENT (Contd)
END OF WORK PACKAGE
1
2
4
5
6
7
3
~