TM-9-2320-386-24-1-2

2-1/2-TON, 6X6, M44A3 SERIES TRUCKS (DIESEL)

TECHNICAL MANUAL; EXTENDED SERVICE PROGRAM (ESP); UNIT, DIRECT SUPPORT AND GENERAL SUPPORT; MAINTENANCE MANUAL; VOLUME 2 OF 2

MAY 2001

  TM-9-2320-386-24-1-2 - Page 70 of 636

29
11
12
13
14
15
17
18
19
20
~
21
~
27
~
5
~
26
25
24
23
22
16
28
TM 9-2320-386-24-1-2
0295 00
POWER PLANT REPLACEMENT (Contd)
0295 00-41/42 blank
END OF WORK PACKAGE
113.
Install transmission oil dipstick tube (WP 0138 00).
114.
Fill cooling system to proper level (WP 0068 00).
115.
Fill transmission to proper oil level (TM 9-2320-386-10).
116.
Fill engine crankcase to proper oil level (TM 9-2320-386-10).
117.
Connect battery ground cable (WP 0121 00).
118.
Prime fuel system (TM 9-2320-386-10).
119.
Start repaired or replaced engine (WP 0298 00) and check operation.
16
19
30
~
4


Back to Top