TM-9-2320-387-24-1

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 1

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-1 - Page 642 of 1205

TM9-2320-387-24-l
1 3-37. FUEL INJECTION RETURN HOSES REPLACEMENT (Cord)
1
e. Nozzle-to-Nozzle
Hose Removal
1
1.
Loosen two clamps (5) and disconnect
hose (6) from two nozzles (4).
2.
Remove two clamps (5) from hose (6).
1
f. Nozzle-to-Nozzle
Hose Inst~~lah&l
1.
Install two clamps (5) on hose (6).
2.
Connect hose (6) to two nozzles (4) with two clamps (5).
g. Nozzle Cap Removal
Remove clamp (2) and cap (1) from rear nozzle nipple (3).
h. Nozzle Cap Installation
Install
cap (1) on rear nozzle nipple (3) with clamp (2).
--
3-74


Back to Top