TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 818 of 1555

TM 9-2320-387-24-2
1 24- 14. REAR-FRONT TIEDOWN BRACKET REPLACEMENT
I
This task covers:
a. Removal
b. Installation
INITIAL
SETUP:
Tools
Equipment Condition
General mechanic’s tool kit:
Wheel removed (nara. 8-3).
automotive (Appendix B, Item 1)
_
Maintenance Level
Materials/Parts
Six locknuts (Appendix G, Item 174)
Direct support
Manual References
TM 9-2320-387-24P
1.
Remove four locknuts (l), washers (21, capscrews (71, and washers (2) from tiedown bracket (3) and
frame rail (10). Discard locknuts (1).
2.
Remove two
locknuts (81, washers (41, capscrews (51, washers (41, vent tube mounting bracket (61,
and tiedown bracket (3) from rear suspension front crossmember mounting bracket (9). Discard
locknuts (8).
Lb’Installation
1.
Install tiedown bracket (3) on frame rail (101 with four washers (21, capscrews (7), washers (21, and
locknuts (1). Tighten locknuts (1) to 260 lb-R (353 N-m).
2.
Install tiedown bracket (3) and vent tube mounting bracket (6) on rear suspension front
crossmember mounting bracket (9) with two washers (4), capscrews (51, washers (41, and
locknuts (8). Tighten locknuts (8) to 90 lb-R (122 N-m).
24-18


Back to Top