TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 904 of 1555

25-13.3. RIGHT FRONT UNDERBODY ARMOR INSTALLATION (Cont’d)
TM 9-2320-387-24-2
25-36.28
Change 1
8.
From inside vehicle, match-drill fourteen 13/32-in. (10.3-mm) diameter holes from passenger side
footwell outer armor (3) and A-pillar armor (4) through right front underbody armor (1).
9.
Install three capscrews (7) and locknuts (5) through passenger side footwell outer armor (3),
A-pillar armor (4), and right front underbody armor (1). Tighten locknuts (5) to 35 lb-ft (47 N
•
m).
10.
Match-drill twelve 13/32-in. (10.3-mm) diameter holes from passenger side footwell inner armor (2)
into right front underbody armor (1). Stop drilling when drill bit penetrates hat section (6). Do not
drill completely through right front underbody armor (1).
MATCH-DRILL
13/32-IN. (10.3-MM)
DIAMETER HOLES
(14 PLACES)
MATCH-DRILL 13/32-IN. (10.3-MM)
DIAMETER HOLES(12 PLACES)
ROTATED 90 DEGREES
3
1
2
4
5
~
1
6
7
4


Back to Top