TM-9-2320-387-24-2

TRUCK, UTILITY: S250 SHELTER CARRIER, 4X4, M1113

TECHNICAL MANUAL; UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE, VOLUME 2

DECEMBER 1997
CHANGE 1

  TM-9-2320-387-24-2 - Page 905 of 1555

25-13.3. RIGHT FRONT UNDERBODY ARMOR INSTALLATION (Cont’d)
TM 9-2320-387-24-2
Change 1
25-36.29
11.
Remove five locknuts (17) and capscrews (11) from right front underbody armor (1) and passenger
side footwell upper armor (18).
12.
Remove six socket-head screws (12) and three retainer plates (10) from right front underbody
armor (1).
13.
Remove two capscrews (22), washers (23), and spacers (21) from inner and outer holes in right front
underbody armor (1) and right rear underbody (24).
14.
Remove three locknuts (5) and capscrews (7) from right front underbody armor (1) and passenger
side footwell outer armor (3).
15.
Remove two socket-head screws (19) from front and rear holes in right front underbody armor (1)
and vehicle side panel (20).
16.
Remove four capscrews (16), washers (15), and resilient mount shim (13) from resilient mount (14)
and right front underbody (1).
17.
Using hydraulic jack, slowly lower right front underbody armor (1) and remove from underneath
vehicle.
18.
Enlarge twelve holes in left front underbody armor hat section (9) to 17/32-in. (13.5-mm) diameter.
19.
Install twelve AVK fasteners (8) into right underbody armor hat section (9).
24
1
8
10
11
12
15
16
17
18
7
19
23
19
22
21
13
3
5
14
9
ENLARGE HOLES TO
17/32 IN. (13.5 MM) DIAMETER
(5 PLACES)
PLACE JACK HERE
20
~


Back to Top