TM-9-2320-434-10

TRUCK, LOAD HANDLING SYSTEM (LHS), 8X8, M1120

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-434-10 - Page 562 of 1324

OPERATION - Continued
•
Ensure rail transport locking pins are disengaged before unloading
flatrack. Rail transport locking pins are used for rail transport only.
Failure to comply may result in damage to equipment.
NOTE
•
The amount of time to load and unload is controlled by engine speed.
Engine speed can be increased to 1,500 to maximum rpm to reduce
loading and unloading times.
•
LHS will only operate when transmission range selector is in N
(neutral).
7.
Move joystick (10) to UNLOAD position until flatrack rollers (11) contact trailer.
8.
Release joystick (10).


Back to Top