TM-9-2320-434-10

TRUCK, LOAD HANDLING SYSTEM (LHS), 8X8, M1120

TECHNICAL MANUAL; OPERATOR'S MANUAL

JUNE 2009

  TM-9-2320-434-10 - Page 562 of 1324

OPERATION - Continued
Ensure rail transport locking pins are disengaged before unloading
flatrack. Rail transport locking pins are used for rail transport only.
Failure to comply may result in damage to equipment.
NOTE
The amount of time to load and unload is controlled by engine speed.
Engine speed can be increased to 1,500 to maximum rpm to reduce
loading and unloading times.
LHS will only operate when transmission range selector is in N
(neutral).
7.
Move joystick (10) to UNLOAD position until flatrack rollers (11) contact trailer.
8.
Release joystick (10).


Back to Top