TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 1039 of 1616

TM 9-2320-440-13&P
0142-3/(4 blank)
0142
4.
Remove four screws (10), lockwashers (11), washers (12), and control valve (13) from outrigger
assembly (14). Discard lockwashers.
END OF TASK
INSTALLATION
1.
Install control valve (13) on outrigger assembly (14) with four washers (12), lockwashers (11), and
screws (10).
2.
Lightly lubricate eight preformed packings (8) with clean oil and install preformed packings (8) and tubes (7)
on fittings (9).
3.
Lightly lubricate two preformed packings (5) with clean oil and install preformed packings (5) and tubes (4) on
fittings (6).
4.
Lightly lubricate preformed packing (2) with clean oil and install preformed packing (2) and tube (1) on
fitting (3).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install right side outrigger pad (WP 0013).
2.
Remove wheel chocks (
END OF TASK
END OF WORK PACKAGE
THAAD0219
TM 9-2320-347-10)


Back to Top