TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 1042 of 1616

TM 9-2320-440-13&P
0143-2
0143
REMOVAL
WARNING
The THAAD hydraulic system operates at oil pressure up to 3,250 psi (22,409 kPa).
Never disconnect any hydraulic line or fitting without first dropping pressure to
zero. Failure to comply may result in serious injury or death to personnel.
NOTE
Position drain pan under hydraulic lines and fittings being removed.
Tag and mark hydraulic lines prior to removal to ensure proper installation.
Cap and plug hydraulic lines upon removal.
Right side and left side outrigger components are removed the same way. Left side
shown.
1.
Remove tube (1) and preformed packing (2) from bulkhead fitting (3). Discard preformed packing.
2.
Remove tube (4) and preformed packing (5) from bulkhead fitting (6). Discard preformed packing.
3.
Remove tube assembly (7) from outer beam (8).
4.
Remove hose (9) and preformed packing (10) from bulkhead fitting (3). Discard preformed packing.
5.
Remove hose (11) and preformed packing (12) from bulkhead fitting (6). Discard preformed packing.
6.
Remove nut (13) and bulkhead fitting (3) from outer beam (8).
7.
Remove nut (14) and bulkhead fitting (6) from outer beam (8).
THAAD0095


Back to Top