TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 508 of 1616

TM 9-2320-440-13&P
0051-8
0051
g.
Fastener Tightening Sequence Procedure
.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
If a component has a critical tightening sequence, it will be illustrated in that particular
work package; otherwise, use the general sequence charts provided in Figure 1.
1.
Installation Torque.
(a)
Tighten nuts twice in a crisscross pattern using a torque wrench.
The first time nut is torqued,
apply approximately 75% of final torque value.
(b)
Repeat sequence a second time until 100% of final torque value has been obtained for each nut.
NOTE
When one or more screws are loose, check torque for all bolts on the component.
-12
1 - 1 1/2
1 - 1 1/4
2 - 1/2
-16
3/4 - 1
-----
2 1/4 - 2 3/4
-20
1/2 - 3/4
-----
2 - 1/2
-24
1/2 - 3/4
-----
2 - 1/2
-32
3/4
-----
1 - 1 1/4
THAAD0583
Figure 1.
General Tightening Sequences.
Table 1.
Recommended Flats Rotation.
THAAD0584
Dash No.
JIC 37-Degree
Flared Hose and Fitting
Machined Seat
SAE 45-Degree
Flared Hose and Fitting
Machined Seat
JIC 37-Degree
Flared Tube


Back to Top