TM-9-2320-440-13-P

TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) CARRIER

TECHNICAL MANUAL; OPERATOR’S AND FIELD LEVEL MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

AUGUST 2010

  TM-9-2320-440-13-P - Page 701 of 1616

TM 9-2320-440-13&P
0089-3
0089
4.
Soldier A and Soldier B remove four locknuts (8), screws (9), and mounting bracket (7) from hydraulic
manifold assembly (10). Discard locknuts.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5.
Soldier A and Soldier B remove screw (12), lockwasher (14), washer (13) from bracket (15).
END OF TASK
INSTALLATION
NOTE
Install cable ties as required.
1.
Soldier A and Soldier B install mounting bracket (7) on hydraulic manifold assembly (10) with screw (12),
lockwasher (14) and washer (13).
2.
Soldier A and Soldier B install mounting bracket (7) on hydraulic manifold assembly (10) with four screws (9)
and locknuts (8).
3.
Soldier A and Soldier B install VIM #2 (4) and VIM #1 (1) on mounting bracket (7) with six screws (6), locknuts
(5) and 12 washers (11).
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NOTE
All connectors are installed the same way. Connector for VIM #1 shown.
4.
Connect connector (4) to VIM #1 (1) and tighten screw (3).
5.
Repeat step (3) for three remaining connectors.
END OF TASK
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
-
-
-
-
-
-
-
-
-
-


Back to Top