PREPARATION OF EQUIPMENT FOR ADMINISTRATIVE STORAGE - Continued
Storage Plan
1.
Store equipment so as to provide maximum protection from the elements and access for inspection,
maintenance, and exercising. Anticipate removal or deployment problems and take suitable precautions.
2.
Take into consideration environmental conditions, such as extreme heat and cold; high humidity; blowing sand,
dust, or loose debris; soft ground; mud; heavy snows; or any combination thereof. Take adequate precautions
in regard to environmental conditions.
3.
Establish a fire plan and provide for adequate fire-fighting equipment and personnel.
NOTE
Steps 4 and 5 apply to the M101A2 and M101A3 trailers.
4.
Remove, fold, and stow the canvas cover assembly (WP
0005).
5.
Remove and stow the rack and tailgate assembly (WP
0005).
Maintenance Services and Inspection
1.
Prior to storage, perform the next scheduled Field PMCS.
2.
Inspect and approve the equipment prior to storage. Do not place in storage equipment that is not
mission capable.
Auxiliary Equipment and Basic Issue Items
1.
Process auxiliary equipment and basic issue items (BII) simultaneously with the major item to which they
are assigned.
2.
If possible, store auxiliary equipment and BII with the major item.
3.
If stored apart from the major item, mark auxiliary equipment and BII with tags indicating the major item and
its registration or serial number and location, and store in protective-type enclosures. In addition, place a tag
or list indicating the location of the removed items in a conspicuous place on the major item.
Correction of Shortcomings and Deficiencies
Correct all shortcomings and deficiencies prior to storage, or obtain a deferment from the approving authority.
Lubrication
Lubricate equipment in accordance with instructions in (WP
0077).
General Cleaning, Painting, and Preservation
CAUTION
Do not direct water or steam, under pressure, against unsealed electrical systems or any
exterior opening. Failure to comply may result in damage to, or destruction of, equipment
or mission.
1.
Clean dirt, grease, and other contaminants from the equipment, but do not use vapor degreasing.
TM 9-2330-202-13&P
0075
0075-2