TM 9-2330-227-14&P
DECK - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REPAIR - CONTINUED
21.
Deck
New board (6)
Put in place making sure tongue and
groove mate with adjoining board.
22.
New board (6)
Two screws (3)
Using ball-peen hammer, drive through
holes.
23.
Two screws (3)
a.
and nuts (4)
b.
24.
Deck
25.
Board (5)
Board (1)
a.
b.
a.
b.
Repeat for remaining holes.
Have assistant hold screws (3) with
3/16-inch flat-tip screwdriver.
Screw on nut (4), and tighten using
1/2-inch socket and ratchet handle
with 1/2-inch drive.
Repeat for remaining nuts.
Put in place against new board.
Repeat step 23.
Put in place against mating board.
Repeat step 23.
5-95