TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 291 of 462

TM 9-2330-238-14
4-81. M447C CURTAIN KIT INSTALLATION (Con’t).
1.
Clean upper folding side door
(3)
and lower folding side door
(2)
end-plates (5) and comer post (1) mounting
surfaces with dry cleaning solvent.
2.
Starting from rear corner of lower left door (2), align one 1-inch (2.54cm) wide hook strip (4) 1/16 (1.59mm)
to 1/8-inch (3.18mm) down from top edge of lower door (2).
WARNING
Use safety goggles or glasses during drilling operations. Failure to follow this warning
may result in serious injury to personnel.
3.
Butt hook strip (4) against lower door (2) end-plate (5). Drill a 1/8-inch (3.18mm) diameter hole through hook
strip (4) centerline and lower door (2) approximately 3/8 (9.53mm) to 1/2-inch (12.7mm) from edge of rear
trailer comer.
4.
Insert one blind rivet (7) in hole to secure hook strip (4) to lower door (2) end-plate (5). Continue drilling and
inserting rivets (7) at 4-inch (10.16cm) intervals along lower door (2) covering panel lock (6) hardware.
5.
Cover 10 panel locks (6) with hook strip (4). Insert one rivet (7) approximately 1/2-inch (12.7mm) from each
side of panel lock (6).
Change 1
4-193


Back to Top