TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 379 of 462

TM 9-2330-238-14
5-26. HINGED ROOF MAINTENANCE (M313) (Con’t).
d.
ASSEMBLY
1.
2.
3.
4.
5.
6.
7.
8.
Position handle (19) in place on hinged roof (18) and install four screws (22).
Position three clamp assembly yolks (44) with assembled handles (36), clevises (14), eyebolts (33), and nuts
(15) in place on hinged roof (18) and install 12 screws (12).
Position two new gaskets (6 and 7) and handle (5) in place on outside of hinged roof (18) and install two screws
(4), washers (29), and new cotter pins (28).
Slide three locking bars (23 and 32) in place through ends of hinged roof (18).
Position two latches (20) in place on hinged roof (18) and install eight nuts (30) and new Iockwashers (31).
Position four locking bar rod end clevises (24) in place on two latches (20) and install four headed straight pins
(25) and new cotter pins (21).
Position two access covers (26) in place on hinged roof (18) and install 20 screws (27).
Position rubber strip (3) and hinge (1) in place on edge of hinged roof (18) and install 75 screws (2).
e.
INSTALLATION
1.
Using sling and hoist, raise hinged roof (18) in place on van body and install 75 screws (2) in hinge (1) and van
body.
2.
Aline mounting holes in four pivot assemblies (10) and hinged roof (18) and install eight screws (11).
3.
Connect wire rope assembly to counterbalance assembly (para 4-60).
4.
Remove sling and hoist.
FOLLOW-ON TASKS:
Retract van body (para 2-13).
5-77


Back to Top