TM-9-2330-238-14

CHASSIS, SEMITRAILER: 6-TON, 4-WHEEL M295A1; SEMITRAILER, VAN: EXPANSIBLE, 6-TON, 4-WHEEL M313; SEMITRAILER, VAN: SHOP, FOLDING SIDES, 6-TON, 4-WHEEL M447 AND M447C; SEMITRAILER, VAN: REPAIR PARTS, SHOP EQUIPMENT, 6-TON, 4-WHEEL M749; SEMITRAILER, VAN: REPAIR PARTS STORAGE, 6-TON, 4-WHEEL M750

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL

JULY 1992

  TM-9-2330-238-14 - Page 388 of 462

TM 9-2330-238-14
5-30. BONNET FRONT DOOR MAINTENANCE (M313 AND M447C).
This Task Covers:
a.
Removal
d.
Assembly
b.
Disassembly
e.
Installation
c.
Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Bonnet front door linkage removed (para 4-64).
Tools/Test Equipment:
Materials/Parts:
Dry cleaning solvent (Item 14, Appendix E)
Personnel Required:
Three
General mechanic’s tool kit
I
a.
REMOVAL I
1.
With two people supporting bonnet front door (7), remove 19 screws (4), hinge (3), and rubber strip (1) from
bonnet front door.
2.
Remove bonnet front door (7) from air conditioner enclosure and set on clean work surface.
5-86


Back to Top