TM 9-2330-247-14&P
Section XII. BODY MAINTENANCE
4-51.
FENDERS
This Task Covers:
a.
Removal
b.
Installation
Inital/ Setup:
Tools/Test Equipment:
Personnel Required: Two
l Handle, ratchet, ~ in. drive
l Socket, ~ in. drive, X6 in.
l Wrench, box-end, X6 in.
ACTION
LOCATION
ITEM
REMARKS
NOTE
Both fenders are replaced in the same way. This procedure Is for one; repeat for the
other.
REMOVAL
1.
2.
3.
4.
Support (16)
Two screws (1),
and fender (5)
washers (2),
Iockwashers (6),
and nuts (7)
Fender (5)
Two screws (4),
and frame (13)
two longer screws (8),
four washers (3),
Iockwashers (9),
and nuts (10)
Frame (13)
Fender (5)
Support (16)
Two screws (15),
washers (14),
5.
Frame (13)
INSTALLATION
6.
7.
Support (16)
and frame (13)
8.
Frame (13)
Iockwashers (11),
and nuts (12)
Support (16)
Support (16)
Two screws (15),
washers (14),
Iockwashers (11),
and nuts (12)
Fender (5)
Using XG in. socket, ratchet handle with
~ in.
drive, and %G in. box-end wrench, unscrew and
take off.
With assistant holding fender in place, unscrew and
take off using XB in. socket, ratchet handle with ~ in.
drive, and XG in. box-end wrench.
With the aid of an assistant, take off.
Using XG in. socket, ratchet handle with ~ in.
drive, and X6 in.
box-end wrench, unscrew and
take off.
Take off.
Put in place.
Screw in until fingertight.
Put in place with the aid of an assistant.
4-126