TM-9-2330-330-14-P

SEMITRAILER, FUEL TANKER: 5000-GALLON, FUEL-DISPENSING, AUTOMOTIVE, M969A3

TECHNICAL MANUAL; OPERATOR’S, ORGANIZATIONAL, DIRECT SUPPORT, AND GENERAL SUPPORT MAINTENANCE MANUAL (INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)

NOVEMBER 2005

  TM-9-2330-330-14-P - Page 182 of 1116

TM 9-2330-330-14&P
0034 00-6
OPERATOR/CREW PREVENTIVE MAINTENANCE
CHECKS AND SERVICES (PMCS)—Continued
0034 00
Table 1. Operator/Crew PMCS—Continued.
ITEM NO.
INTERVAL
ITEM TO BE
INSPECTED
PROCEDURE
NOT FULLY
MISSION
CAPABLE IF:
4
5
6
7
8
9
10
11
12
Before
Before
Before
Before
Before
Before
Before
Before
Before
Engine
Centrifugal Pump
Batteries
Filter/Separator
Hose Tubes
Hoses
Vapor Recovery
Kit
Tires and
Wheels
Hubodometer
Perform before engine operating
procedures listed in WP 0007
00, paragraph G.
Inspect pump for signs of leaks.
Check batteries for secure
mounting.
Check relief valve for debris at
top of filter/separator. Remove
debris.
Inspect hose tube lock bars for
obvious damage or missing
parts. Check all mounting
hardware for loose or missing
components. Check drain holes
for clogs or debris. Remove
debris.
Inspect for completeness and
serviceability.
Check discharge outlet for
debris or any other foreign
matter. Clean debris and foreign
matter from discharge outlet.
Check all mounting hardware for
loose or missing components.
Inspect tires and wheels for
unusual wear or damage.
Inspect for proper mounting and
damage.
Engine does not
operate and is
required for
mission.
Any fuel leaks are
present.
Battery is required
for mission but is
damaged.
Hoses are
damaged or
missing.
Vapor recovery kit
is required for
mission, but is
damaged.
Tires or wheels
have damage that
could result in tire
failure.


Back to Top