TM 9-2330-394-13&P
DRAWBAR EYE REPLACEMENT - Continued
0092 00
0092 00-3/4 Blank
Change 1
INSTALLATION
1.
Position drawbar eye (4) on drawbar (5) with washer (3) and nut (2).
NOTE
•
Ensure slot in nut aligns to hole in drawbar eye while tightening to proper torque to
allow cotter pin to be inserted.
•
Step (2) requires the aid of an assistant.
2.
Tighten nut (2) to 450-650 lb-ft (610-881 N·m).
3.
Install cotter pin (1) in nut (2).
OPERATIONAL CHECKS
1.
Couple trailer (WP 0043 23, TM 2320-392-10-1, Coupling Trailer).
2.
Tow trailer and check for proper operation.
3.
Uncouple trailer (WP 0043 24, TM 2320-392-10-1, Uncoupling Trailer).
END OF WORK PACKAGE