TM 9-2330-334-13&P
DRAWBAR REPLACEMENT - Continued
0090 00
Change 1
0090 00-10
OPERATIONAL CHECKS
1.
Install drawbar eye (WP 0092 00, Installation).
2.
Install drawbar lift valve (WP 0094 00, Installation).
3.
Install bump stop and bump stop extension (WP 0104 00, Installation).
4.
Install gladhand hoses (WP 0079 00, Installation).
5.
Fill air tanks.
END OF WORK PACKAGE