TM-9-2330-334-13-P

FAMILY OF MEDIUM TACTICAL VEHICLES (FMTV) LOAD HANDLING SYSTEM TRAILER (LHST) M1147A1

TECHNICAL MANUAL; OPERATOR AND FIELD LEVEL MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL)

DECEMBER 2013
CHANGE 1

  TM-9-2330-334-13-P - Page 743 of 1184

TM 9-2330-334-13&P
SAFETY CHAIN ASSEMBLY REPLACEMENT
0091 00
0091 00-1
THIS WORK PACKAGE COVERS:
Removal, Installation
INITIAL SETUP:
Maintenance Level
Equipment Conditions
Field
Trailer uncoupled (WP 0043 24, TM 2320-392-
10-1)
Tools and Special Tools
Tool Kit, Genl Mech (Item 24, WP 0167 00)
GENERAL
This work package contains information and instructions to replace the Load Handling System Trailer (LHST)
safety chain assembly.
REMOVAL
NOTE
Left and right safety chain assemblies are removed the same way.
Left safety chain
assembly shown.
1.
Remove pin (1), spring collar (2), and clamp half (3) from clamp half (4).
2.
Remove clamp half (4) from chain link (5).
3.
Remove clamp half (3) from safety chain assembly (6).


Back to Top